Tuesday, February 9, 2010

SLAB POURED

Today was a step forward with the slab finally being poured. Recycled water pipes are now to be installed along with pit, then frames and trusses will go up afterwards. So slowly but surely things are progressing. The master bedroom is to the left, then patio with double garage to the right. Click on any image on this site to ENLARGE any photos you want to look at.








Just a little water left from some light drizzle in the afternoon, but nothing excessive. Just need a few good days of sun now, which is expected so all is looking good.